Wednesday, 11 December 2013

11th December 2013 - Fourth Day of Production

10th December 2013 - Third Day of Production

9th December 2013 - Second Day of Production

Shooting scenes #7 and #8

Our second shoot was a bit shorter than a first one due to us only shooting two scenes. The reason for that was those two scenes were shot at the same location - our school. Now we have 6 scenes shot in total and 6 more to go. The scenes we left our selves to shoot are ones down the St. Margaret's Bay, the A20 and in a house. We left those scenes 'till last as we need to get transport to get us there.

We plan to shoot the scenes down the A20 on the 10th of December, scenes down the St. Margaret's Bay on the 11th of December and at a house on the 16th of December.

Thursday, 5 December 2013

4th December 2013 - First Day of Production

Shooting scenes #1, #6, #9 and #11

We did our first shoot. We shot these scenes together as they all take place in the same location in the story. They are all of the interrogation room scenes and since they all had to be shot on the green screen we had to set everything up in the classroom and in all of the scenes Alex had to have the same make up done. It was just easier to do all of them in one shoot.

This is the time lapse of the make up being done: